Procter & Gamble Factory
Gyöngyös
20.000 m²
Procter & Gamble Factory
Upon the order of Procter&Gamble, KÉSZ Group implemented factory construction projects in a Design&Build structure, including preparation of the permission and construction drawings. The Babycare plant was constructed in stage 1 of the Gyöngyös plant project and was given LEED Silver qualification as an industrial facility. Implementation of stage 2 (Aster-OralCare) was the first work of the Group in which a projected 3D model was used at the construction site for technical consultation.