Our Group held its ground even in the most difficult construction circumstances arisen during construction of the Videoton Stadium and in 2018 we constructed the steel structure of more than 1,250 tons above the newly built bleacher, the roof structure of the main building and the steel structure supporting the main facade. Construction of the "suspended" grid structure at the corners of the stadium was a really great challenge. We were compelled to change the pre-designed installation technology quickly as the site conditions have not provided for optimum installation, so we could performed the works ordered from us in due time by the remotely coordinated operation of several crane trucks.